BTS Optimisations

This Diesel Generator Optimisation solution is ideal for sites that have no grid power options and have a high power usage within a small site footprint. Sites such as these sites cannot utilise solar due to size constraints. This power solution allows the operator to run at a guaranteed 53 percent diesel reduction, it has also been tested in West African conditions for twelve months. The DGO utilises the General Electric Sodium Metal Halide battery which has a small footprint requires no cooling and has in excess of 10 000 cycles.

Off-Grid Power Solution

Servatis has a wealth of experience in building 100 percent off grid BTS sites in some of the harshest environments. Solutions range from 1kW to 4kW continuous power; with 72 hour autonomy incorporating wind and solar and the addition of a standby generator where necessary.